I have been doing some more work recently. The gearbox is now mounted, I have aligned the rear sprocket with the gearbox sprocket, finished off the bracketry and sorted out the tachometer in the dash
Also, there does not appear to be a SPA section belt in the length I need (525mm), which is slightly annoying. So I have ordered NuT link belting which should mean I can adjust the tesnsion realtively easy as my gearbox is fixed in place with the engine (I was going to go with a tensioner, but if I can avoid it, then good!
I have also started the paperwork crap that needs to happen with the DVLA.
Some pictures







































